...

The construction of Gelendzhik treatment facilities for 4.3 billion rubles repeats fate …

no picture no picture
no picture

The construction of the treatment facilities of Gelendzhik for 4.3 billion rubles repeats the fate of the sewage treatment plants in Sevastopol. “The concessions of the water supply-helendzhik” were chosen by the contractor LLC “Modern Renovation Systems”, yesterday they talked about the work of the SSR in Crimea. The problem that the authorities of the Krasnodar Territory try not to notice is almost similar design decisions of the South Cos in Sevastopol and Gelendzhik. The main leitmotif of which was not so much theft of budget funds, but a poorly done construction project.

Both in Sevastopol and Gelendzhik, designer JSC “Ecos” (Novocherkassk-Moscow). The implementation of the project implies the use of filters and equipment manufactured by Ecos. These are often outdated, not effective and non -modern solutions. For example, (in addition to analysis Sevastopol colleagues) Design Measures to reduce the risk of infection of the population with pathogens of parasites for disinfecting garbage and precipitation formed during wastewater cleaning, from helminthic eggs into the wastewater supply pipelines into the designed mechanical cleaning plants provide for the introduction of the Purotta Bingsty drug. Commission for the fight against pseudoscience and falsification the results of scientific research under the Presidium of the Russian Academy of Sciences gave negative expert opinion on the use of the drug Bingsty and I contacted the General Prosecutor’s Office on the fact of imposing the drug to enterprises, not corresponding to the declared manufacturer characteristics.

The author’s control over the construction of treatment facilities in Gelendzhik is conducted by ECCOC JSC, for 1.7 million rubles. Earlier, in December 2019, LLC “Ecoline” (Yekaterinburg) became the winner of 770 million tender for the construction (preparation for construction) of the same structures. Criminal cases against employees of water supply concessions are rattling in different regions of Russia. In the Krasnodar Territory, dealers are unsinkable, as well as waste, which will be dumped 1,681 meters in the sea at a depth of 37.5 m (declared by the project).
In 2018, the Russian government allocated 2 billion rubles for construction in Gelendzhik, but trading was carried out only two weeks ago. How the construction will end, if it ends at all, it is easy to predict. Theft, criminal cases and the absence of modern treatment facilities in Gelendzhik. The resort city, where the growing palaces of federal officials and ministers of the cult will soon be closed into the area of ​​elite Favel.

Advertisement

“ВЧК ОГПУ”