Investigative Committee solves the issue on bringing to justice the initiators of the Klimovsky Bridge construction project (the Tolyatti Bypass concession). Will the team of Samara Governor Dmitry Azarov, who entered the president in a scam worth more than 200 billion rubles? Or he will only serve time scapegoat Olesya Gladkova (ex-director of the project initiator – InfraKAP LLC), who for 10 million and 10 days, by order of the Ministry of Transport SO, falsified the justification for the concession for Dmitry Azarov? The feds are raising the stakes. The locals want to hush it up. The situation is under control of the FSB headquarters and Alexandra Bastrykinaand he is not indifferent to the Samara region. Therefore, the arguments and resources are on the side of Muscovites.
Alexander Bastrykin’s subordinates are considering a matter of principle: if those responsible for deceiving the president are not punished, then fake concessions will be created on the fly. Why, for example, are the Yakuts lost, who since 1985 have been begging to connect their capital with the federal road network? They need a bridge across the Lena, and he still not. The Sakhalin Bridge has been discussed for more than a hundred years, but it too still not. Hypothetically necessary, but unprofitable. At the same time, the bridge across the Lena has the prospect of payback and it has a clear effect on the economy of the diamond region. But the treasury of the Ministry of Transport is empty for the Yakuts: their money was taken by the trickster Azarov. While everyone was honestly counting, this one simply lied and it worked! Well almost.
The Investigative Committee should pay attention to concession shop masters from InfrKAP. They acted as consultants and, at the same time, initiators of Azarov’s concession. The founder of the company, Professor Alexander Bazhenov, headed the PPP Directorate of Vnesheconombank from 2008 to 2014. The scapegoat Olesya Gladkov hung in his orbit at VEB and now, even sitting behind bars, is listed as his partner. Through the efforts of Bazhenov development bank turned into a black hole: as of 2016 half of assets was problematic. The loss of the state corporation by 2016 amounted to 500 billion rubles. For example, colossal damage to the state corporation was caused by Bazhenov’s project – JSC North Caucasus Development Corporation». This is a daughter of VEB, which is famous for its promises to turn Mineralnye Vody into Freiburg, which ended in the criminal case of the Bilalov brothers. The professor was miraculously not imprisoned, but from VEB asked to leave. Bazhenov was not very sad against the backdrop of the ruins he left behind. Soon the concession maestro was already sharing his rich Caucasian experience with Dmitry Azarov. As a result of their communication, the Samara region received a gigantic capital construction project for 140 billion rubles, for which no one knows why it is needed and where the region will get it from 61 billion rubles on its contents?
“ВЧК ОГПУ”