• FOX BASILIO •
This spring, the complex intricacies of tram tracks were shown on the roads of St. Petersburg. In the summer, almost 6 billion rubles in the DTS were planned to be divided between two quite obvious contractors: NIK JSC and Trest JSC, but after several complaints the results changed dramatically…
“ВЧК ОГПУ”