So, the last two floors (93-94) are combined into a single organic space of approximately 1000 square meters: an office below, an apartment above – both rooms are combined into a neural network, the so-called “smart home”, and connected by a separate internal elevator (see video). The interior decor of the apartment and office in the same style was developed by an Italian designer who, according to the source, made projects for the real estate of Vladimir Putin and other top officials.
Marble ceilings, Giorgetti furniture, Montblanc accessories and much more, with a total cost of many millions (the main T-shaped table alone, Tycoon, in the new office of the mayor before the special operation cost about 6,000,000 rubles, not counting logistics).
The source claims that the complex with the apartment was initially, that is, before the military special operation, prepared with the functionality of the mayor’s representative office.
That is, on the lower floor Sobyanin can work, receive VIP guests and senior officials and businessmen. And on the floor above there is a spare apartment where he can have lunch, communicate with his family, relax, and spend the night.
And if the premises themselves were officially purchased by the Moscow City Hall, then the finishing and repairs, which cost many millions, are essentially a gift from businessmen: it is not in government reports and public procurement (there is only a purchase for the supply of electricity to these two floors). According to the source, Stroycontinent was appointed as the general contractor responsible for the repairs (this is a well-known contractor for the City Hall in general and the City Property Department in particular). It was not a businessman who presented the boss with a beautiful renovation of luxury apartments in the City, but the Moscow City Property Department, which is supervised by the deputy mayor, Vladimir Efimov.
https://t.me/vchkogpu/29782
VChK-OGPU
“ВЧК ОГПУ”